Doomsday Fortress/C761 Change
+ Add to Library
Doomsday Fortress/C761 Change
+ Add to Library

C761 Change

The biggest change was naturally the wall in front of the gathering place.

The six excavators began work at the same time, digging out a five meter wide and three meter deep crater in front of the wall. Of course, this was not used to resist the corpses.

Because they wanted to pass the gathering place, there was already a deep hole in front of them that blocked their way

Continue to read this book on the APP
Unlock this chapterCost: 4 Bricks
Setting
Background
Font
18
Nunito
Merriweather
Libre Baskerville
Gentium Book Basic
Roboto
Rubik
Nunito
Page with
1000
Line-Height